|
#13
|
||||
|
||||
![]()
Hi guys
been working on the track these last couple of days. its now bigger and has 2 new big jumps wich is for jumping across the track. Im working on a "bridge solution" between these jumps to make it a littlebit more safe. Also got enough soil/dirt to make a triple combination or a 2+2 combination, but dont know where to place it yet. I want the track to work in both directions to get some variasions when i`m training. It was -2 degreese when filming and a lot of frost in the grass, and the grass was high so it didnt go very fast, but you get the general idea of how its going to be. Cheers http://www.youtube.com/watch?v=5hqxRqSD2VA http://www.youtube.com/watch?v=xO4cINw0Lzo
__________________
TRF 511 TRF201X TLR22 Futaba 4PL GMBK Norway |
Thread Tools | |
Display Modes | |
|
|