Go Back   oOple.com Forums > General > I Made This !

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #13  
Old 06-11-2010
JensK's Avatar
JensK JensK is offline
Member
 
Join Date: Oct 2008
Posts: 173
Default

Hi guys
been working on the track these last couple of days. its now bigger and has 2 new big jumps wich is for jumping across the track. Im working on a "bridge solution" between these jumps to make it a littlebit more safe.

Also got enough soil/dirt to make a triple combination or a 2+2 combination, but dont know where to place it yet.
I want the track to work in both directions to get some variasions when i`m training.
It was -2 degreese when filming and a lot of frost in the grass, and the grass was high so it didnt go very fast, but you get the general idea of how its going to be.

Cheers

http://www.youtube.com/watch?v=5hqxRqSD2VA

http://www.youtube.com/watch?v=xO4cINw0Lzo
__________________
TRF 511
TRF201X
TLR22
Futaba 4PL
GMBK
Norway
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 02:29 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
oOple.com