Hi Everybody,
As many of you know by now I have been secretly building a track on the NDOR site.
It started of when Tim and Pete approched me to ask if I could turn around their track and not to forget it is to be mainly 5th scale as that was the heart and sole of the club.
I said it wont be mainly 5th scale, it will be multi scale. From 5th to 10th scale.
We had a company in to remove the rotten astro that was down on the track and grade the track to what I was after. I had nearly 200 ton of soil put onto the track, to make the burm and jumps.
After they had finished I thought that the burm wasn't big enough (More Height) so we hired a digger and roller and set to it. I had a gang on the wheel barrows moving the soil that was cut away. "Where are we putting this?" "Erm...... The double in front of the rostrum, More Height ;-)!"
My wife (Tracey) was on the wheelbarrow and rake for 5 days and putting young men to shame ;-) She has been working down the track with me for nearly 5 weeks now.