|
#1
|
||||
|
||||
![]()
At the members meeting last night we decided to fix the rostrum in it's current position whilst fixing the steps and guard rail around the top of the cabin.
Some lads are going down this sat to remove the old steps as they are currently a safety hazard. However we then are having a MAJOR work day on Sat 22nd April (day before NECR regional), with some (skilled) people working on the rostrum and the rest of us doing various track clearing, grass cutting/strimming etc. There really is a lot of work to do but if we can get enough people then we can break the back of it on the one day, maybe look at astroturfing the clay corner which to be honest has had it's day now. Do Bury have any spare old astro we can have, doesn’t need to be that much really! So we are appealing for as many people as possible to come down and help on the Saturday, bringing any tools, lawn movers, strimmers they can. Dianne is typing up a calendar as we speak, we hope to run all the free weekend in the NE calendar and also some when the nationals are on for those that don’t go, they can still have good local club racing. First meeting will be Sunday April 29th !!!!!!!!!!!!!!!
__________________
Nortech is ACE! |
Thread Tools | |
Display Modes | |
|
|