View Single Post
  #15  
Old 20-02-2008
MattADH MattADH is offline
Mad Member
 
Join Date: Oct 2006
Posts: 1,038
Default

I am only going to be down the track until 11.30am but am aiming to be there before 9am.

Not sure what is happening as Paul Bricknell has a few more jobs to do including linking the scrutineering hut and race control with power and finishing the second fix in scrutineering. We also hope to fit a couple of external sockets.

Job wise for Saturday includes:

Remove the parts of the fence that we are going to repair or replace
Undercoat all areas that need it on scrutineering including door
Start building the framework in race control for longer worktop
Move yellow seating rail on rostrum to front to support boarding

I am also going to suggest to Steve that we get the compressor we spoke about for the next winter series round to see how it goes. I think I have raised about two-thirds of the money from Andy Turnbull and Martin Butler!!!

Finally, We are on the lookout for a cheap, mains powered two-way radio so that the guys in scrutineering and race control can talk to each other.

Hope to see you all there with your money - Martin, Andy, Niggs - £12 BRCA
Reply With Quote