Thread: Meeting 21/3/14
View Single Post
  #5  
Old 23-03-2014
Danny Harrison's Avatar
Danny Harrison Danny Harrison is offline
Mad Member
 
Join Date: Mar 2012
Location: Leeds
Posts: 1,268
Default

Quote:
Originally Posted by neallewis View Post
we need to brush the floor before the track is laid down. it's tricky to do after the track is down, and its a significant factor in how fast tge grip improves.
it takes no time at all to push two brushes round a clear hall in strips, before the track goes in. afterwards it takes significantly longer and you can't remove all the dust.
Theres only me n nick to do it all. Dont feel like sweeping the place when its gonna take us over an hour to empty cupboard n build track to be honest. Especially when people turn up and watch me tape the whole track..... :P

Was still taping at 6 when people were putting cars down. Got there just after 4.30 too.

Might take twice as long to brush after. Lets say ten min instead of 5. Thats 5 min ontop of our hour n half, or ten min for someone who lands at 6. I know which im going for pmsl.
Reply With Quote