View Single Post
  #157  
Old 16-01-2014
Gavin Collingwood Gavin Collingwood is offline
Mad Member
 
Join Date: Jul 2007
Posts: 1,427
Default

Yes we've changed builder and are much more happy with him, as long as the quote he gives us is reasonable i.e not nearly 20K that Dave wanted!! (hahahahahaha) and our feeling when talking to him was that it would be much MUCH lower, then plans going ahead end of jan/feb and will take 1 week to complete. I've just finished drawing up the detailed drawings of the track design so wheels will start turning very soon bud!
__________________
TLR
ABSIMA
Horizon Hobbies
G Paint
Answer RC
Reply With Quote