Quote:
Originally Posted by ashleyb4
we dont have just one we all have a say on it.
A
|
So long as all work together and do 1 corner at a time, like I said, if not then it means the track has been built disjointedly, less opinions have gone into each corner and we end up with a right broth.
As for track width, perhaps a proposal for the 2008 AGM is in order? Southport, Kiddy and Bury all have narrow sections to the rules, but practically the tracks are all fine, so perhaps the width rule needs reducing? I could be wrong, its upto us to propose and vote the ruling though.