View Single Post
  #1  
Old 04-10-2012
ianholt ianholt is offline
Member
 
Join Date: Jul 2011
Posts: 43
Default Track work, YOUR club needs you!

Anybody up for a track work day?
I am thinking about organising a track work day soon, it would need to be a week day so I can get a digger down there! I would like to get some drainage put in draining in to a sump near the 1/10th rostrum and sort out the abortion at the top of the main straight. If time allows it would be nice to level off the back straight as well.
I can organise a wacker, digger, disc cutter etc so we just need some man power!
It would be good to get this done before winter sets in, I was thinking about a Thursday maybe but can work around what ever day is best for you!
With the drainage installed the track will be more useable through winter.
So who can help?
Reply With Quote