Well I loved it, the track is definitely a good basis to build on. The double definitely needs to be a table top so your not forced to try and clear it in one.
Drainage would go next on the list after the tabe top. Due to the ground the track is on its going to be a headache, other than that very good start to what has the potential to be right up there with the other permanent tracks in the Regional series.