View Single Post
  #97  
Old 05-02-2012
YoungChazz's Avatar
YoungChazz YoungChazz is offline
Mad Member
 
Join Date: Mar 2006
Posts: 1,073
Default

Paul's 5.2 has been shipped to Ellis, and Paul will begin making the 6.0 later this week. Paul is entered at Motorama mid-month and will run the 6.0 there.

Ellis will not have the 5.2 for long, because Paul will make two 6.0s when he does it. Therefore, Ellis should have a 6.0 before the end of February.

We believe the 6.0 will solve all the outstanding issues, and will be extremely close to a production car. If so, we'll work out the set-ups this spring and start production as soon as possible.

Jimmy has a point -- we have been working on this thing forever. However, two things have gotten in the way. First, my illness halted everything except the bare necessities for almost a year. By the time I got back, events in the marketplace forced us to do the SCX - 60CF. Even though our primary focus the last 6 months has been the SC, Paul, Ellis, and Elvo have kept working at the X - 7; once initial production & launch of the SC is over, it's full speed on the 7.

So it won't be long now.
__________________


Engineering Without Fear
www.XFactoryRC.com
www.facebook.com/XFactoryRC
Reply With Quote