Thread
:
HB Pro Stadium Truggy!
View Single Post
#
2
27-03-2011
Candyman
Member
Join Date: Apr 2009
Posts: 204
I bash one regularly, im in bedfordshire too
3S on each side, 6S in total
With this high speed bashing I have found a few weak spots and done some mods here and there, I found where the wishbone hangers attach to the gearbox, this can loosen and you end up with the wishbones wobbling about, so I made some new plates that attach to the geearbox in the same way AND also attach to the chassis for a solid mounting point.
Other problem I found is the front knuckles, they break too easily and come loose with that silly threaded idea. So using Kyosho hub carriers (a few quid), jammin CRT cnc hubs (£10 ebay) and MGT CVDs (£10 ebay) I converted the front end to use the T nuts from the CRT, much better idea as you can get a lock nut on the outside.
Candyman
View Public Profile
Send a private message to Candyman
Find all posts by Candyman