Quote:
Originally Posted by Legacy555
If you going to rinse out the bearings, check ballstud tolerances, run in the gearbox, tap all necessary holes, ream all of the hinge pin paths, drill pistons and prep each piece - remove flashing and tidy up, and of course, cut and paint the body..... you'll need an absolute minimum of 12 hours - I prefer to do it over 3 or 4 evenings.
|
That's a lot of work to bui;d a kit

Is that down to the quality?