View Single Post
  #4  
Old 24-03-2011
Legacy555 Legacy555 is offline
Mad Member
 
Join Date: Sep 2009
Location: Dublin, Ireland
Posts: 1,533
Default

If you going to rinse out the bearings, check ballstud tolerances, run in the gearbox, tap all necessary holes, ream all of the hinge pin paths, drill pistons and prep each piece - remove flashing and tidy up, and of course, cut and paint the body..... you'll need an absolute minimum of 12 hours - I prefer to do it over 3 or 4 evenings.
__________________
www.facebook.com/racewayone
RACEWAYONE :: LMR :: MIBOSPORT :: RC CONCEPT :: SMD
Trader Feedback: http://oople.com/forums/showthread.php?t=81070
Reply With Quote