View Single Post
  #9  
Old 19-03-2011
neiloliver neiloliver is offline
Mad Member
 
Join Date: Dec 2005
Location: Shrewsbury
Posts: 1,208
Default

We made good progress today, the race control roof is now sealed, the trees have been cut back, the leaves all removed from the back of the track, the plaster board removed, much of the old pipe cut up, the advertising signs on the building removed, the race control sign removed, the speaker/lighting pole removed and all of the wood has been cleared from under race control. The mesh has also been removed from the windows ready for glass to be measured up.

There is still lots to do tomorrow. - See you there.

Thanks to Ash, Dave, Mat and Phil who helped today.
Reply With Quote