Quote:
Originally Posted by martin so16
find out some prices for the ply and what size timber you after as i mite be able to get some
the plan with the new jumps is so we can move them about as well
|
The plan is they will be moveable, the bigger stuff will be four man lifts. A huge double hump thing is planned. 3m in length and in two sections. I will do some drawings and bring them with me this Sunday.
I can get wood, lots of it too. The flexy ply will have to be bought to go over the frame work.
I have a carpenter whilling to come to the track and build anything we want !!!!!!!!!

The only payment to him would be in beer.....
We just need to sort out a Saturday when we can all be at the track to do it.