View Single Post
  #149  
Old 02-08-2010
Dave Treacy Dave Treacy is offline
Member
 
Join Date: Jun 2010
Posts: 87
Default

I think it to do with H&S assessment for the site / disabled lift etc.

Technically it's still as building site and only gets handed over by the contractor around the 16th.
Reply With Quote