View Single Post
  #191  
Old 30-04-2010
Fabs Fabs is offline
Mad Member
 
Join Date: Jan 2007
Posts: 1,133
Default

Quote:
Originally Posted by paulc View Post
Wooo good work fabs looking good for end of may then

Paul
I'd say so yes, we're still at the mercy of a sub-contractor making stuff in his own time, but since the ally bits pretty much only need anodising now and I was quoted 5 days for that, we should be fine.

I'm happy with the gearboxes now but they've been moving premises so need to get back up to speed, and they need to make one modification to the mold (that's only to allow them to get better yeld on production, it won't influence anything else). I'd say the gearboxes will be the last thing ready, which isn't a surprise given they've always been the tricky part.
Reply With Quote