Quote:
Originally Posted by Kash
Looks Awesome...  What kind of track surface you guys looking at?
|
Not sure but I can practically guarantee it won't be a dirt track, I worked it out roughly to needing over 1000 tonnes of dirt to fill the area a metre deep across it's area and then when the lease is over what do you do with all that.
So that would leave a mixed surface track, concrete, carpet, astro, anything else I can find.
Peter