Over the course of the day from 9am this morning, we have removed some six sections of kerbs and filled in the holes, dug out the new cobble section ready for next week, tidied up the Astro on the large table top and ironed out some bumps after the small table top.
The approach to the Raceway bend has been improved and the section where we have removed part of the tarmac has had the RSJ cut down and made neater.
We had a large delivery of top soil arrive first thing and this has been used to build up some of the infield sectiosn that have dropped. The Astroturf on the infield inside the Raceway bend has been taken up, top soil added and just waiting on seeding.
Think that's about it!
Many thanks to all that helped and are donating towards the club.
|