Firstly I'm not an expert, what I would do is test for power out the timer box if youre not getting any power out then just hot wire into the boiler for now from the supply to see if you can get the thing fired up (establish it should be a 240v feed going in from the timer box).
If you can get it fired up that way you can at least get your wallet warmed up for when the Heating Engineer arrives