Hello.

Now we got the 300 m3 of earth and the works will begin this weekend.

Here is our Time plan
FRIDAY

marking with poles

SATURDAY

building jumps and banks

NEXT WEEK

fine works

Here are some new aerial views of track
(on the left side of the track you can see 300 m3 of earth)



Here is a last track plan
http://file.si/file/105DRVA_julij_EN.pdf (enter code (koda) and click save file (Prenesi datoteka!))

We are still not 100% sure, how to position the back-straight jumps.
In the last track plan, jumps G and H are positioned so, that before jump G is 6 m of straight space, between jumps is 8 m of space and after landing we have 4 m of straight.

Are those proportions (6m/8m/4m) good, or should they be 5m/8m/5m or maybe 8m/8m/2m?

Same doubts we have with jumps C and H.

Thanks for helping.

Greetings,

Chipo