If you were anything like me and tore into the package because you were so excited you might have missed the 10pc bag of 0.1mm shims taped to the inside of the box. Construction of the bottom screw-in cartridge into the shock body is:-
| Shock Body
----------------------
| Upper rod guide
| Red o-ring
| Black spacer
| 0.1mm shim
| 0.1mm shim
| Black spacer
| Red O-ring
| Lower Rod guide
---------------------
| Screw-in bottom cap
The upper rod guide gets pushed into the shock body first from the bottom and is a tight fit.
Hope that helps!
|