![]() |
A bit of digging
4 Attachment(s)
Had a few hours to spare today due to frost, so got my spade out and got digging, got rid of the jumps on the rallyx track
|
2 Attachment(s)
And not wanting to leave the tenth track out I had a go were the hole was beside the straight, so in time we can cut the surrounding grass and move the track over a bit, I did loads more rolling after I took the photo so its a lot smoother but the light was fading
|
Somebody's been had at work. Good job Dave.
I'm liking that bank, is that usable or just a by product?:drool: |
very usable;). and part of the plan
Sholders ache a bit now tho:bored: |
Quote:
|
Looks good, I reckon we could do with a morning or a day to sort out the jumps, or maybe even remove them completely until we can build some nice new ones.
|
Dave you have been a busy bee , looking great :drool:
|
Quote:
Whats the matter with our high quality jumps:p |
Quote:
Hmm you know what I mean :rolleyes: |
got wet and cold today, but between me and sara,(I show her a great day out:wub) both tracks are rolled with twin drum roller, trackmarkers resorted, and new dirt section put in, but I have done it so we can leave it out if to wet by moving 2 pipes.....but jumps still there, well I had to save something for everyone:lol:. I give up with the rubber straps for the pipe, I think we may resort to bailor twine, as it will last longer. no photos as it was dark when I finished
|
All times are GMT. The time now is 08:48 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
oOple.com