![]() |
Novak GTB 4 cell
Hi there, I'm hoping that one of you could help me out.
I was wanting to know if the above esc could handle a 6 cell pack if the wiring was upgraded and a heatsink is added? The ESC would just be used for bashing with a 7.5 light novak brushless in a 1/10 Tamiya F1 car. If you think that the GTB internals are totally different to the GTB 4 cell and cannot be converted to suit my application then please let me know. Thanks in advance Richard :D |
Email the tech dept at Novak, I'm sure they'll get back to you with an accurate answer.
|
ok, will do, thanks
|
Novak reply.......
The concern is that there is no heat sink to dissipate the heat that will generate from using a higher voltage pack. The circuitry will handle a 6 cell pack but you may need to find a heat sink from a standard GTB in order to do this. Respectfully, John Hallman Novak Electronics, Inc. $$ |
I have got a standard GTB heatsink if you want it.
|
i may get hold of a 4cell and do the same then do you have to put the heetsink straight onto the FETs or can it be to the top of the case
|
Thanks you you kind offer for the heat sink. I have manged to 'manufacture' a suitable heatsink, but as a matter of interest how much would it cost to buy your heat sink?
Also,another question, the 4 cell comes with 16 guage wiring, if i'm running a 5.5 lrp x11, should i upgrade to 14 guage or would the 16 be ok? I'm thinking the 16 my get a little warm, but i'm out for 100% performance so would that be an issue. thanks again richard |
Quote:
|
| All times are GMT. The time now is 07:23 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.
oOple.com